Best ADU Company US - Eano

How Long Does It Take To Renovate A Bathroom?

By

Zia

|Last Updated: 08 Oct 2024

Generally, the process can take six weeks up to three months to permit planning, execution, and finishing loose ends.

If the process entails moving electrical and plumbing, get ready to apply for board approvals and city permits. This might turn out as the largest culprit in delaying the renovation timelines. Maybe you’ve started the process, and you aren’t sure how long does it take to renovate a bathroom. Follow this guideline to better comprehend all the things involved during your bathroom remodel.


The step-by-step process of renovating a bathroom needs a strict timeline. Before you start the works, you will need time to do a couple of things, including: 

  • Preparing for detailed plans; 
  • Getting approval from the council if need be;
  • Choosing the products;
  • Hiring the contractor 

 


 


PRE-CONSTRUCTION PHASE 


While this is usually the most noticeable development stage, there’s a lot that takes place before getting that heavy hammer. Here are the subtleties that you need to tick before getting the project started. 

 

STAGE 1: CLOSING ON YOUR PROPERTY 


This can take 1 to 3 months. Some renovators have several homeowners on their list preparing or seeking to close their properties. You should hold up until you have shut on the property, with your keys close by, before you do anything. If you’re in a rush, hold up until you’ve signed the agreement before starting the design procedure. 

 

 

STAGE 2: POSTING YOUR PROJECT 


This step goes for 1 to 3 days. You start requesting offers, and while the process continues, you add the space details on what you need to be renovated. You may also include inspiration photos and other information that would assist in getting an ideal contractor. After receiving the offers, you should get the time and check on the reviews, including their past clients and their past projects. You want to find a suitable contractor for the task. 

 

 

STAGE 3: SCHEDULING SITE VISITS & REQUESTING OFFERS 


This step takes 1 to 3 weeks. After checking on the profiles of various contractors, you pick the one you want to meet on location by scheduling a meeting. An on-location visit is an ideal approach for this kind of meeting. It helps the contractor to comprehend the extent of the undertaking, the possible physical outcomes, and confinements of the space. Both of you also get the chance to check on whether it’s possible to meet the project’s demands. After the on-site visit, you expect to get a written bid within 5 to 7 business days. 

 

 

STAGE 4: LEVELING OFFERS & PICKING A CONTRACTOR 


This takes 1 to 2 weeks; to receive the entire written offer. You need bids leveling primer, and in case you have follow-up inquiries, it’s the ideal opportunity to ask. You can likewise plan time with a project advisor to walk you through the multiple bids before making your choices. 

 

 

STAGE 5: SIGNING AGREEMENT & SETTLING ON DEVELOPMENT PLAN 


This takes approximately one week. After you’ve chosen a contractual worker, the individual in question will assemble an agreement for you to assess. This will regularly incorporate a portrayal of the task to be carried out, the cost outline, and the payment timings in the entire project. 

 

 

STAGE 6: OBTAINING PERMITS & APPROVALS 


The time taken here widely varies. Ordinarily, this is the stage where delays and hiccups take place. Getting board approvals and obtaining the right permits keep many people seeking renovation on board. But you can get a contractor to advise you on how to navigate the process without excessive delay. If you’re moving gas lines or plumbing, you’ll need a modeler and extra DOB grants. Some may get the permit in just two weeks, but other approvals go for months. If you dwell in a stand-alone residence, you don’t have to stress over structure board endorsements. However, you’ll still require the imperative city grants for electrical or plumbing tasks, which ensures that everything you do is up to code.

 

 

STAGE 7: SOURCING MATERIALS 


The time on this stage varies widely. If you’re the one accountable for sourcing some or the entire materials for the project, place the orders immediately after the design plan is completed. Some substances involve long lead times, and you shouldn’t delay your renovation due to one substance. If time is a worry, take a gander at what’s presently in stock and that you can ship. Talk with your contractual worker about planning the substance delivery to match with the time of renovation. 

 

 

STAGE 8: TELL YOUR NEIGHBORS 


Be a decent neighbor and warn those next to you that a renovation is starting unavoidably. You need about 15 minutes to do this. Caution them of what’s expected and let them know the time that the project will last. Your question on how long does it take to renovate a bathroom should be answered by now. 

 


 

CONSTRUCTION PHASE 


While most of the tasks under this phase are your contractual worker’s duty, it’s imperative to comprehend the happenings of the site. The most significant advances you’ll be responsible for here are making planned installments to your contractual worker. The schedules are outlined in your agreement, and thus you ought to keep an open schedule for a couple of hours every week. During this time, you will answer questions about changes or details that surface throughout development. 

 


STAGE 9: IT IS DEMO TIME 


This takes one day. You’ve not completed the paperwork, and it’s the moment for your contractor to get that heavy hammer. Ensure you safeguard the substances in cover or plastic. Contingent upon how huge your washroom is, and the broadness of the renovation, this should take a maximum of 4 hours. 

 

 

STAGE 10: REROUTING PLUMBING & ELECTRICAL 


This phase takes 1 to 2 days. Since you’ve stripped the space to the studs, it’s easier now to check on where the new electrical or plumbing will pass through. Think about whether any plans should be changed since you can view what’s behind the dividers. 

 

 

STAGE 11: CITY INSPECTIONS & SIGN-OFFS 


One hour on-site is enough. If you required city grants, you may require reviews and a close down before closing on the dividers, and a last close down also. You may look at what the City needs to state about plumbing and electrical permits. While it might take the overseer an hour to carry out his responsibility at the site, booking the real appointment might take days or weeks. It’s only a master plumber who’s ordinarily permitted to sign off waterlines if the City inspector is absent. However, the inspector must look at and affirm any undertaking on gas lines. You are not permitted to shut down the dividers and shift into another project phase before this assessment occurs. 


 
Generally, with electrical work, inspectors are scheduled for visits after the project is complete. They check the outlets, electrical panels, and junction boxes. At times, due to delays and bureaucracy in the City, your electrical assessment might be rescheduled a few times. Check with your architect or contractor about what your undertaking requires. 

 


STAGE 12: INSTALLATION OF FLOOR TILES 


This takes around 12 hours to 1 day. To avoid redoing of flooring, if you choose to reconfigure your space, later on, ensure that the floor is well set for the assignment, regardless of whether some of it will be covered up. 

 

 

STAGE 13: INSTALLATION COMPLETION 


The contractor will need 1 to 3 days to finish installing everything from vanity and sink, tub, toilet, and any built-in shelving. Lighting, hardware, and tiling generally come last. 

 

 

STAGE 14: CLEAN-UP 


This takes one day. Commonly, contracts permit that space is left in broom swept condition. But you might need to contract post-construction cleaning experts. These ensure your new floor is sparkling clean. You might also seek the service people to clean your whole home since the dust normally settles in even in other places.

 


 

POST-CONSTRUCTION PHASE 


The end goal is in sight. But remember these last but significant steps. 

 

 

STAGE 15: FINAL STROLL WITH CONTRACTOR 


The final walkthrough takes 30 minutes. Assess the work done with your contractual worker. Check each of the drawers and entryways, and take a gander at grout lines and edges and ensure everything is operating well as required. If there’re any issues, bring them up and include them on the punch list. 

 

The contractor might fix it right away if it’s a minor issue or even set another date for the task. Some professionals recommend that you keep notepads in every space and don’t speak to your contractual worker for about fourteen days during this time. But you’ve to take notes of what should be fixed in your new residence. 

 

 

STAGE 16: PUNCH LIST THINGS 


You need 1 to 5 days contingent upon the category of the items. Something like straightening a door for a cabinet to installing the last out-of-stock thing will take a day or several weeks. Your contractor can return and fix everything within a few days.

 


STAGE 17: FINAL PAYMENT 


This takes around 10 minutes. You’ve been paying in installments in the entire renovation. But once the final thing in the punch list has been tended to, it’s a great opportunity to cater for the remaining installment to your contractor. You may, in advance, isolate the steps that you feel may be obstructions to assign more time to complete them. 

 

Since you know how long does it take to renovate a bathroom, you’re now in a better position to plan your next project well.

Get In Touch
Thank you for visiting Eano! Subscribe now to receive free renovation tips, discounts on materials and more!

To log in, simply enter your email address—no password needed.

Or

Learn about Eano ADU

Make the most of your backyard

Learn More

TOP 10 POSTS

Remodeling Service

ADU

Harness the New Era of Housing Flexibility

Bathroom

Create Your Dream Bathroom

Flooring

Small Update To Full Remodel